Indian Railways encyclopedia

Scope and roadmap

Eight areas. Each is labelled with what exists. Nothing is filled with unsourced text to look complete.

Staged, not finishedStage A (this edition): supported material, search, evidence drill-down, real downloads, explicit gaps. Stage B: close annual source gaps, add entity schemas for places and lines, first-connection claims. Stage C: expand across places, rolling stock, institutions and operations, with a coverage test per topic.
1. History and geographyin progress

Chronology, railway companies, lines and sections, state and UT connectivity, changing boundaries, zones and divisions, dated maps.

Partly built: first connections, 36-state checklist, 24 turning points.
2. Network and placesplanned

Routes, gauges, electrification, stations, junctions, bridges, tunnels, workshops. Each entity needs a stable ID, aliases, location, dates and a source.

Planned
3. Trains and servicesin progress

Service families, route histories, suburban and freight categories. Timetables are valid-on-date records.

Partly built: daily services and regional evidence.
4. Technology and operationsin progress

Locomotives, coaches, wagons, traction, signalling, safety systems, capacity.

Partly built: speed series.
5. People, institutions and passenger lifeplanned

Governance, labour, ticketing, classes, fares, accessibility, heritage. Biographies need source review.

Planned
6. Economy and freightin progress

Traffic, commodities, revenue, expenditure, investment. Budget estimates, revised estimates and actuals stay apart.

Data staged (commodity panel); chapter planned.
7. Safetyin progress

Annual measures, an event register, inquiry findings. Allegations, preliminary and final findings stay separate.

Partly built: annual counts across regimes.
8. Data and methodologyin progress

Downloadable tables, source catalogue, definitions, conflicts, corrections, coverage dashboard.

Built (this edition).